To complete this job, it required a range of skills that C G Jones Brickwork was able to offer to RSK with a high standard from start to finish.

The existing ceiling was a form of fabric material combined with steel re-enforcing. It was a difficult task to overcome the difference as the depth of the ceiling varied from 5mm to 30 mm.

Although with our highly skilled tradesmen we were able to overcome the problem and were able to attach a 12mm fire-board to close off the holes. The holes were also rendered and painted.

Our client RSK was extremely satisfied with this quality of work and we will continue to work with them in the near future.